Asian-News.net is your go-to online destination for comprehensive coverage of major news across Asia. From politics and business to culture and technology, we bring you the latest updates, deep analyses, and critical insights from every corner of the continent. Featuring exclusive interviews, high-quality photos, and engaging videos, we keep you informed on the breaking news and significant events shaping Asia. Stay connected with us to get a 24/7 update on the most important stories and trends. Our daily updates ensure that you never miss a beat on the happenings in Asia's diverse nations. Whether it's a political shift in China, economic development in India, technological advancements in Japan, or cultural events in Southeast Asia, Asian-News.net has it covered. Dive into the world of Asian news with us and stay ahead in understanding this dynamic and vibrant region.

Contacts

  • Owner: SNOWLAND s.r.o.
  • Registration certificate 06691200
  • 16200, Na okraji 381/41, Veleslavín, 162 00 Praha 6
  • Czech Republic

A robot’s attempt to get a sample of the melted nuclear fuel at Japan’s damaged reactor is suspended

TOKYO (AP) — An attempt to use a telescoping robot to remove a sample of melted fuel from a wrecked reactor at Japan’s tsunami-hit Fukushima Daiichi nuclear power plant was suspended Thursday due to a technical issue.

The collection of a tiny sample of the debris inside the Unit 2 reactor’s primary containment vessel would start the fuel debris removal phase, the most challenging part of the decades-long decommissioning of the plant where three reactors were destroyed in the March 11, 2011, magnitude 9.0 earthquake and tsunami disaster.

The work was stopped Thursday morning when workers noticed that five 1.5-meter (5-foot) pipes used to maneuver the robot were placed in the wrong order and could not be corrected within the time limit for their radiation exposure, the plant operator Tokyo Electric Power Company Holdings said.

The pipes were to be used to push the robot inside and pull it back out when it finished. Once inside the vessel, the robot is operated remotely from a safer location.

The robot can extend up to 22 meters (72 feet) to reach its target area to collect a fragment from the surface of the melted fuel mound using a device equipped with tongs that hang from the tip of the robot.

The mission to obtain the fragment and return with it is to last two weeks. TEPCO said a new start date is undecided.

The sample-return mission is a first crucial step of a decades-long decommissioning at the Fukushima Daiichi. But its goal to bring back less than 3 grams (0.1 ounce) of an estimated 880 tons of fatally radioactive molten fuel underscores the daunting challenges.

Despite the small amount of the debris sample, it will provide key data to develop future decommissioning methods and necessary technology and robots,

Read more on apnews.com